Brittan Elementary District
Technology Plan
We have come a long way since
the introduction of student computer access at
We are in constant transition
with the upgrading of our infrastructure/hardware, the assessment of student
needs, the focus on grade level skills development and the integration of
technology into the classroom. We
have a District Board, certified/classified staff, and community that is
supportive of our need for growth in technology.
Over the last few years, we have discovered that there
are no local schools available to use as a model to aid in exploring and
implementing a successful technology program at the K-8 level. We would like to demonstrate an
exemplary use of technology tools and a successful integration of technology
into the K-8 curriculum.
Insufficient funding slows our progress and development into the
prototype we plan to become.
Demographic
Data:
Student
population
(district):
618
Student
minorities
(district): Asian: 1.6%
Black: 0.6%
Filipino: 0.2%
Hisp./Latino: 13.8%
Am. Ind./Alaskan: 2.3% Multi/no
response: .3%
Pacific Islander: 0.5%
White: 80.7%
Percentage of student population eligible for school lunch program: 55%
English
Learners: 2%
Fluent-English-Proficient:
10%
Certificated: 38
Pupil/Teacher ratio:
K-3rd 18:1,
4th
–8th 27:1
Classified
Employees: 28
Because we are
a one school district, we have a limited number of stakeholders who participated
in the planning process. We did
gather input from a wide range of sources.
We used parent and teacher surveys. We used input from members of our
technology team, which includes teachers from the primary, intermediate and
upper grades, parents, board members, technology coordinator, computer lab
assistant, and our superintendent/principal.
Technology
Planning Team: (List
members)
|
Name |
Position |
Organization |
|
Earnie
Graham |
Superintendent/Principal |
|
|
Florrie Turner |
Technology Specialist |
|
|
Lynda Sandage |
Computer Lab
Assistant |
|
|
Robin
Murtha |
7th/8th Grade Teacher
Rep. |
|
|
Kathy
Myszka |
5th/6th Grade Teacher
Rep. |
|
|
Michelle
Schoffstall |
4th Grade Teacher
Rep. |
|
|
Fran
Kauffman |
2nd
/3rd Grade Teacher Rep. |
|
|
Don
Hagland |
District Board
Member/Parent |
|
|
Michael
Dobson |
Network
Administrator |
|
|
Bernie
DiDario |
Business
Owner |
Self
Employed |
|
Ginger
Harris |
Parent
|
Community
Member |
|
Michelle
Ziegenmeyer |
Parent/Brittan Activity Club
Representative |
Community
Member New District Board Member
December 2002 |
This group, or members of it, met during September,
October, November and December 2002 to develop the plan. The staff, through
surveys and focus groups, was involved in the plan’s development. The Plan was
reviewed by the full Site Council, (representing the overall community), at its
December 2002 and January 2003 meetings.
Parents and community members other than SSC members were invited to
attend. The entire staff has also
reviewed the plan and provided input.
The
District
Vision for Technology Use:
This district
plan is envisioned to guide the school/district for the next three years. As a result we anticipate that by June
of 2006:
Expected
student outcomes in 3 years as a result of technology
use:
¨
After three
years of participation in the
¨
Increased
student access to technology learning resources will improve their mastery of
California Content Standards as measured by STAR and local
assessments;
¨
Students will
be proficient in essential computer skills and
applications;
¨
Students will
triple their use of the Internet for research purposes.
¨
Proficient information
literacy skills will allow students safe and relevant use of technological
learning resources;
¨
Selected students will
provide basic computer trouble-shooting and tech support for computers at
school.
Expected staff outcomes in 3
years as a result of technology use:
Upon
completion of a required and structured training program, to be carried out over
a 3-year period, our certificated/classified staff will have acquired the
confidence and skill to use technology for classroom management, instruction,
and personal use.
¨
Teachers will
triple their use of technological learning resources to organize, teach and
assess student learning in California Content Standards.
¨
School staff will
electronically track each child’s school-based data and his/her progress in
mastery of California Content Standards.
¨
All teachers will meet
Technology Proficiency Standards set by the California Commission on Teacher
Credentialing.
Expected technology outcomes in 3 years; infrastructure, hardware, tech support and software:
Infrastructure:
¨
By June of
2006 we plan to put in a fiber optic backbone to all buildings in our local area
network.
¨
We will
purchase additional switches and hubs, and upgrade our
servers.
Hardware:
¨
By June of
2006 we plan to have fully networked, Internet
accessible, IBM compatible, multi-media systems in grades K-8, and in our
32-station computer lab.
¨
The classroom student to
computer ratio for grades 3-8 will be at least 4:1 by June of 2006.
¨
All classrooms
will have TV/VCR, DVD Player, and either a digital projector or an AverKey to
display work from a computer to the entire classroom. Scanners and Digital/Video Cameras will
be supplied to grades K-8 (1 for each grade K-5,
6th classes, 7/8 Core, Science, Music, Elective
rooms.)
¨
Additional
AlphaSmart carts will be purchased to provide access to grades 3-8 (1 cart each for 3rd
classes to share, 1 cart for 4th grade classes to share, 1 cart
shared by every 2 classrooms for 5th & 6th grade
{3carts}, 1 cart 7th, 1 cart 8th ).
¨
Current cart placed in
library for units to be checked out by students.
¨
Four laptop
computers will be purchased and made available to staff members for all school
use.
Tech
Support:
¨
Technology
Coordinator
¨
Technology
Trainer/Lab Director
¨
Computer Lab
Assistant
¨
Technology
Mentors at each grade level.
¨
Student
Technology Classroom/Lab Aides
Estimated 3
year cost.
|
|
2003&2004 |
2005 |
2006 |
Total |
|
Staff
Development |
10,500 |
21,000 |
21,000 |
52,500 |
|
Hardware |
100,000 |
100,00 |
100,000 |
300,000 |
|
Software |
10,000 |
10,000 |
10,000 |
30,000 |
|
Infrastructure |
4,000 |
10,000 |
10,000 |
24,000 |
|
Tech
support |
73,000 |
73,000 |
73,000 |
219,000 |
|
Annual
Total |
197,500 |
214,000 |
214,000 |
625,500 |
Software:
¨
Basic keyboard
drill and assessment software for use in the computer lab and in the classrooms.
¨
Microsoft
Windows XP/Office XP Suite on all of school computers.
¨
Maintain
current programs.
¨
Network and CD
Rom lab packs of reading, language arts, and math and science software to
support
The plan must provide for a sufficient budget to acquire
and maintain the hardware, software, infrastructure and technology support
personnel.
Expected
funding/budget outcomes in 3 years:
Identified sources
¨
A percentage
of the general fund.
¨
Site
Improvement Funds
¨
Brittan
Activity Club (parents club)
¨
Lottery
Fund
¨
Categorical
funding, including Title I
¨
Proposed
Sources
¨
School
Renovation Technology Grant
¨
Enhancing
Education Through Technology Grant
¨
Community fund
raising
Expected
monitoring and assessment outcomes in 3 years:
¨
Annual
increases in teachers’ technology proficiencies per the CTAP2
Assessment.
¨
Annual
increases in teachers’ use of technology to enhance
curriculum.
¨
Students’
progress in mastering the California Content Standards in the core
curriculum.
¨
Students’
progress in acquiring information literacy skills.
¨
Annual
maintenance and infrastructure upgrade activities are reviewed and adjustments
made as indicated.
Evaluation process to
monitor progress:
|
|
Hardware |
Software |
Infrastructure |
Tech Support |
|
Monitor and Evaluation |
Annual review of numbers placement and usage/types of units. |
Annual review of types, applicability to curriculum, alignment to standards and compatibility to hardware. |
Annual review of bandwidth speeds, number of hubs and ports. |
Annual review of workload and speed of service delivery, network & software maintenance and training/support for software. |
|
Person Responsible |
Technology Coordinator & Superintendent/ Principal. |
Technology Committee Superintendent/Principal |
Technology Coordinator & Superintendent/ Principal. |
Superintendent/Principal. |
Expense Type/ Funding Source –
Key
|
Code |
Description |
|
C |
Categorical District Ed Tech
Funds (SIP, Title II Part D) |
|
F |
(Name of District) General
Fund/Schools |
|
G |
Grants and other Outside
Funds |
3.a. Staff and
student access to technology
All students
including
Special Education & English Language Learners
have access to computers throughout the day, and after-school as arranged with
staff. The student to computer ratio is:
|
K-3rd Grade
|
One teacher computer per
classroom Used for testing if
necessary, Student use in lab. |
|
4th
Grade |
8:1
|
|
5th/6th
Grade |
5:1 |
|
7th/8th Grade Core classrooms,
Science classroom, Electives classroom |
6:1 |
|
7th/8th Math & Music
rooms |
15:1 |
Students with
special needs are assessed upon registration and the school works with the local
SELPA to provide adaptive equipment as needed. Since all of our students including our
ELL/ELD students are fully integrated, there is no specific time set aside for
computer use. Students access the
computers in the lab, library and classrooms throughout the day.
Our classroom
and library computers are all older then 4 years and many are slow and not
dependable. All of the schools
computers are networked locally and have Internet access. Our 32-station computer lab is equipped
with 8 new multimedia computers and 24 old computers (without CD Rom
drives). The new systems have
different operating and office suite systems than the rest of the lab. This affects the learning process.
Additional work is created when working with a large class with students using
different word processing systems.
Our new systems will not run some of our old network software.
Currently, we
have consistent problems with the computer labs ability to function at 100%
capacity without freezing. This
often prevents classes from using the keyboard software programs, and causes
down time during the classes limited lab time.
3.b. District’s
current use of hardware and software to support teaching and
learning
All teachers were
surveyed as to their use of technology learning tools in the core curriculum in
grades K-8; 100% responded to the CTAP2 technology survey. Greatest use of software occurred in the
English/language arts curricula.
Heaviest use occurred in grades five through eight, as students were
required to use computers to type reports and do research on the internet in
their English/language arts curriculum.
Fifth – Eighth
students use the Internet, word processing and presentation software in
addressing standards relating to summarizing, responses to literature, research
and persuasive writing activities.
They also use Alpha Smart 3000 units to type rough drafts of major
writing projects. In lower grades
computer software is used to become familiar with keyboarding, letter
recognition, beginning reading skills development,
computer skills, & computer art. Science curricula included some use of the
Prentice Hall website for the sixth – eighth grades. Title I students utilize AlphaSmart keyboards and word processing
software. Teachers reported using
science kits, overhead projectors and videos more frequently than computers, the
Internet or software. The
integration of technology skills into the curriculum is currently dependent upon
the skill and interest of the individual classroom
teacher.
3.c. District’s
curricular goals
To increase the annual gain
in reading and math, the district decided to provide Accelerated Reader for all
students in grades 1-8, and Accelerated Math for 7th/8th
grades in 2003, and 5th/6th grades by August 2004. Both
programs are also used for special education students. Additional training and enrichment
software is needed to fully integrate these
programs and support all students. These goals are supported in our SIP plans
& in the districts strategic plan.
The table below shows that
|
|
Brittan
Elementary Students Scoring at or above the 50th NPR on the 1998-2002 Star
Tests |
| ||||
|
|
| |||||
|
|
2002/2003
8th Grade |
2002/2003
7th Grade |
2002/2003
6th Grade |
2002/2003
5th Grade |
2002/2003
4th Grade |
2002/2003
3rd Grade |
|
| ||||||
|
Spring
2002 |
7th
45% |
6th
44% |
5th 53% |
4th 46% |
3rd 44% |
2nd 56% |
|
Spring
2001 |
6th
40% |
5th 40% |
4th 44% |
3rd 47% |
2nd 53% |
|
|
Spring
2000 |
5th
38% |
4th 39% |
3rd 45% |
2nd 34% |
|
|
|
Spring
1999 |
4th
43% |
3rd 39% |
2nd 44% |
|
|
|
|
Spring
1998 |
3rd
44% |
2nd 37% |
|
|
|
|
|
|
|
|
|
|
|
|
|
Math |
2002/2003
8th Grade |
2002/2003
7th Grade |
2002/2003
6th Grade |
2002/2003
5th Grade |
2002/2003
4th Grade |
2002/2003
3rd Grade |
|
| ||||||
|
Spring
2002 |
7th
66% |
6th 64% |
5th 60% |
4th 51% |
3rd 68% |
2nd 61% |
|
Spring
2001 |
6th
63% |
5th 52% |
4th 68% |
3rd 50% |
2nd 68% |
|
|
Spring
2000 |
5th
45% |
4th 46% |
3rd 55% |
2nd 46% |
|
|
|
Spring
1999 |
4th
57% |
3rd 48% |
2nd 57% |
|
|
|
|
Spring
1998 |
3rd
41% |
2nd 59% |
|
|
|
|
|
|
|
|
|
|
|
|
|
Language |
2002/2003
8th Grade |
2002/2003
7th Grade |
2002/2003
6th Grade |
2002/2003
5th Grade |
2002/2003
4th Grade |
2002/2003
3rd Grade |
|
| ||||||
|
Spring
2002 |
7th
55% |
6th 64% |
5th 62% |
4th 48% |
3rd 51% |
2nd 62% |
|
Spring
2001 |
6th
46% |
5th 51% |
4th 58% |
3rd 40% |
2nd 60% |
|
|
Spring
2000 |
5th
41% |
4th 46% |
3rd 42% |
2nd 41% |
|
|
|
Spring
1999 |
4th
22% |
3rd 39% |
2nd 43% |
|
|
|
|
Spring
1998 |
3rd
37% |
2nd 39% |
|
|
|
|
|
|
|
|
|
|
|
|
|
Spelling |
2002/2003
8th Grade |
2002/2003
7th Grade |
2002/2003
6th Grade |
2002/2003
5th Grade |
2002/2003
4th Grade |
2002/2003
3rd Grade |
|
| ||||||
|
Spring
2002 |
7th
53% |
6th 53% |
5th 48% |
4th 41% |
3rd 42% |
2nd 39% |
|
Spring
2001 |
6th
51% |
5th 48% |
4th 37% |
3rd 30% |
2nd 43% |
|
|
Spring
2000 |
5th
47% |
4th 38% |
3rd 25% |
2nd 25% |
|
|
|
Spring
1999 |
4th
33% |
3rd 42% |
2nd 27% |
|
|
|
|
Spring
1998 |
3rd
32% |
2nd 34% |
|
|
|
|
From the spring of 2000-2002
STAR Testing,
NPR points in 5th
– 8th grade improved as follows:
NPR Growth in 3 years
3.d. Curriculum integration to improve teaching
and learning
Goal
statements:
3.d.1 All students K-8 will use technology resources to achieve CA Content Standards in English, History/Social Science, Math and Science.
BENCHMARKS:
|
June,
‘03 |
Technology will be fully
integrated into core content areas of English, History/Social Science,
Math and Science for 7th through 8th grade
classrooms with additional staff training. |
|
June,
‘04 |
Technology will be fully
integrated into |
|
June,
‘05 |
Technology will be fully
integrated into |
|
June,
‘06 |
Technology will be fully
integrated into |
3.d.2 Students in grades 4-8 will
utilize technology resources to improve their Math
proficiencies.
BENCHMARKS:
|
June,
‘04 |
Content specific software in
Math will be integrated into 7th through 8th grade
classrooms with additional staff training. |
|
June,
‘05 |
Content specific software in
Math will be integrated into 4th through 6th grade
classrooms with additional staff training. |
|
June,
‘06 |
Content specific software in
Math will be integrated into 1st through 3rd grade classrooms
with additional staff training. |
List of activities and a timeline for
implementing planned strategies and activities:
Goal
# |
Implementation
Plan/Activities |
Resp.
Position |
Timeline |
Budget Source |
Monitoring
and Evaluation activities |
|
3.d.1 |
Staff collect examples of
student work & identifies current use of technology in classrooms for
7th – 8th grades |
Staff &
Admin. |
Nov.,
‘03 |
N/A |
Student technology work is reviewed and assessed by
staff and admin. |
|
3.d.1 3.d.2 |
Team researches technology
resources in |
Staff |
Nov.,
‘03 |
F |
Presentation of findings to staff and recommendations
for adoption |
|
3.d.1 3.d.2 |
|
Admin. |
Dec.,
‘03 |
C,
F |
Software installed and
configured |
|
3.d.1 |
Staff development is
provided for 7th & 8th grade for using
reading/math programs |
Staff &
Admin. |
Dec.,
‘03 |
F,
G |
Certificates of completion; lesson and unit plans
developed |
|
3.d.2 |
Staff development is
provided for 7th & 8th grade in teaching
reading/math and integrating technology |
Staff &
Admin. |
June
‘03 |
F,
G |
Certificates of completion; lesson and unit plans
developed |
|
3.d.1 3.d.2 |
Samples of student work in
|
Staff &
Admin. |
June,
03 |
N/A |
Evaluation results are shared with the entire staff
for input on improvement |
|
3.d.1 3.d.2 |
Student STAR test scores
evaluated; strategies developed to improve
results |
Staff &
Admin. |
June
‘03 |
N/A |
Results presented to staff,
community, school board |
|
*Cycle is repeated for years 2005 and 2006 assuring
completion of benchmarks or changes resulting from evaluation
results. | |||||
3.e. Student acquisition of
technological and information literacy skills.
The use of information
literacy as a research process needs to be
implemented across the K-8 grade levels to
enhance students’ safe and effective use of the Internet for research purposes.
This plan will focus on K-8 grade levels to insure that students are proficient
with the information literacy process by grade 8. Staff will work to develop
their own skills with the Big 6 and Big 3 processes.
Technology
literacy skills:
3.e. Goal statement
3.e.1
BENCHMARKS:
|
June,
‘04 |
Students will demonstrate
Big 6 information literacy skills by completing a research project in at
least two of the core content areas in grades 6 through
8. |
|
June,
‘05 |
Students will demonstrate
Big 6 information literacy skills by completing a research project in at
least one of the core content areas in grades 4 through
5. |
|
June,
‘06 |
Students will demonstrate
Super 3 information literacy skills by completing a project in one of the
core content areas in grades K through
3. |
3.e.2.
BENCHMARKS:
|
Aug.,
‘03 |
|
|
June,
‘04 |
At least one component of
the continuum will be piloted in grades K-8. |
|
June,
‘05 |
At least two components of
the continuum will be piloted in grades K-8. |
|
June,
‘06 |
The continuum will be fully
implemented in grades K-8. |
List of
activities and a timeline for implementing planned strategies and
activities:
|
Goal |
Implementation
Activities |
Resp. Position |
Timeline |
Budget |
Evidence of Activities
|
|
3.e.1 3.e.2 |
The Technology Task Force
revises the existing continuum of technology
skills. |
Staff |
May
‘04 |
F |
Review of CTAP2,
CTAP Guidance
|
|
3.e.1 3.e.2 |
Teacher team presents a
recommended model to full faculty |
Staff |
June
‘04 |
N/A |
Faculty meeting agenda
discussion |
|
3.e.1 3.e.2 |
Superintendent takes the
faculty-adopted model to the Board for adoption |
Admin. |
August
‘04 |
N/A |
Board
agendas |
|
3.e.1 3.e.2 |
Professional development
focuses on how to integrate information literacy and computer proficiency
curriculum model into core curriculum and assess student
proficiencies. |
Admin. Staff |
August
‘04 |
F |
Professional development
agenda and attendance sheet |
|
3.e.1 |
Following Board adoption,
Students will demonstrate Big 6 information literacy skills by completing
a research project in at least two of the core content areas in grades 6
through 8 |
Staff |
Sept ‘04–Jan
‘05 |
N/A |
Lesson Plans and other
curriculum documents; student work |
|
3.e.2 |
Following Board adoption,
all teachers pilot at least one component of the computer proficiency
curriculum integrated into their core instruction and assessment
practices |
Staff |
Oct. ’04-May
‘05 |
N/A |
Lesson Plans and other
curriculum documents; student work |
|
3.e.1 3.e.2 |
Results of the integration
of computer & information literacy proficiency skills is discussed at
faculty meetings |
Admin. Staff |
June ’04 Sept. ’04 Oct. ‘04 |
N/A |
Faculty meeting
agendas |
|
3.e.2 |
Teachers evaluate the
effectiveness of the pilot, modifying it for implementation next year to
the ’04 benchmark |
Admin. Staff |
Jan ‘05 |
N/A |
Survey regarding the
effectiveness of the model piloted – presentation of findings to faculty –
modifications as indicated by data. |
|
3.e.1 |
Teachers evaluate the
quality and effectiveness of 6-8 information literacy; modifying it for
implementation of ’04 benchmark |
Admin. Staff |
Jan
‘05 |
N/A |
As
above |
|
3.e.1 3.e.2 |
Teachers support each other
in full implementation of technology proficiency and information literacy
curriculum |
Staff |
Feb. ’05-June ’05 and
thereafter |
N/A |
Teacher evaluation includes
a strand relating to the integration of computer proficiencies in core
curriculum. |
|
Cycle is repeated for years 2005 and 2006 assuring
completion of benchmarks or modifications from evaluation
results. | |||||
3.f. List of clear goals and a specific
implementation plan for programs and methods of utilizing technology that ensure appropriate access to all
students.
All
Core Classrooms: 5
multimedia, Internet accessible student computers, one networked student
printer.
Science Room: 5 multimedia, Internet accessible
student computers two-networked student printers.
Elective Classroom: 5 multimedia, Internet accessible
student computers, one networked student printer.
Math Classroom: 2 student
computers (students also sent to Library or Computer Lab for
testing.)
Music Classroom: 2 student
computers (students also sent to Library or Computer Lab for
testing.)
PE Classroom: 2 student
computers (students also sent to Library or Computer Lab for
testing.)
Goal: All students will have access to current
hardware, software and safe/appropriate Internet
resources.
Benchmarks:
3f.1 Special needs students
will be evaluated annually and a determination made if technology will help with
their learning needs.
3f.2 A URL filtering system
for the Internet will insure appropriate access for
students.
3f.3 Students will have
their parents sign, and they will sign, an Internet Use Policy that is kept on
record in the Aeries student data section, and filed on
site.
3f.4 By June 2004, all
7th/8th grade classrooms will have 5 new or upgraded
multimedia computers with current software systems available for student
use.
3f.5 By June 2005, all
5th/6th grade classrooms will have 5 new or upgraded
multimedia computers with current software systems available for student
use.
3f.6 By June 2006, all
4th grade classrooms will have 5 new or upgraded multimedia computers
with current software systems available for student use.
3f.7 By June 2006, all
K-3rd grade classrooms will have 5 multimedia computers (passed down
from upper grades) and loaded with appropriate grade level software. They will also have Internet access and
at least one networked student printer.
|
Goal # |
Implementation Plan/Activities |
Responsible Dept. or Position |
Timeline |
Budget Source |
Monitoring and Evaluation activities |
|
3f.1 |
Special needs students are evaluated for special technology needs |
Special Ed Teacher, Superintendent/Principal |
Sept. of each school year. |
District, Categorical Funds |
Superintendent/Principal Special Ed Teacher will use classroom observations. |
|
3f.2 |
Technology Coordinator will monitor URL and block inappropriate sites reported by staff |
Technology Coordinator |
Ongoing |
District |
Reports made to Site Council, administrators on a bi-monthly basis. |
|
3f.3 |
Students will sign and take home to parents the Internet Use Policy |
Computer Lab Director, Classroom Teachers, Secretaries |
Ongoing as students enroll at Brittan |
District |
Staff will have a list of students who have a list of students who have not returned the Internet Use Policy. These students will not have access to the Internet. |
|
3f.4, 5, 6 |
Buy/lease Computers |
Technology Coordinator |
Spring of 2004, 2005, 2006 |
Title one, District, etc. |
Annual inventory of equipment, site council minutes |
|
3f.7 |
Update software and move old computers in to primary classrooms. |
Technology Coordinator |
Spring of 2004, 2005, 2006 |
District |
Annual inventory of equipment |
Benefits from utilization of
technology to ensure appropriate access for students.
1.
All students will learn to
use technology as productivity tools.
2.
The URL filtering system
helps to ensure safety and appropriate access to web sites while students
explore the Internet.
3.
The Internet Use Policy
informs parents and students of their responsibility in the appropriate use of
the technology and the Internet.
4.
Continuing to reduce student
to computer ratio increases daily access for students. These computers are newer, multimedia
units and they provide more dependable access.
5.
Students without computers
at home will have access to computers and the Internet on a daily
basis.
3g. List of clear goals and
a specific implementation plan to utilize technology to make student record
keeping and assessment more efficient and supportive of teachers’ efforts to
meet individual student academic needs.
Goal: All administrators, teachers, and
support staff, will utilize technology to make student record keeping and
assessment more efficient and supportive of teachers’ efforts to meet each
student’s academic needs.
Benchmarks:
3g.1 By June 2004, teachers,
support staff, and administrators will access Aeries for student information and
record keeping.
3g.2 By June 2004,
7th/8th grade teachers will use the ABI computerized grade
book to keep student grades.
3g.3 By June 2005,
5th/6th grade teachers will use the ABI computerized grade
book to keep student grades.
3g.4 By June 2006,
3rd/4th grade teachers will use the ABI computerized grade
book to keep student grades.
|
Goal # |
Implementation Plan/Activities |
Responsible Dept. or Position |
Timeline |
Budget Source |
Monitoring & Evaluation activities |
|
3g.1 |
Teachers will receive a training on use of Aeries |
Comp. Lab Director/Secretary |
November 2002 Spring 2003 |
F |
Roll sheet from training. |
|
3g.2 |
7th/8th grade teachers will receive training on use of ABI grade book |
Tech. Coordinator, CL Director, Attendance Secretary |
November 2002, January, March, May and August 2003 |
F |
Evaluation of grade books turned in by teachers. |
|
3g.3 |
5th/6th Grade teachers will receive training on the use of ABI grade book. |
Tech. Coordinator, CL Director, Attendance Secretary |
March 2003, May 2003, August 2003 |
F |
Evaluation of grade books turned in by teachers. |
|
3g.4 |
3rd/4th Grade teachers will receive training on the use of ABI grade book. |
Tech. Coordinator, CL Director, Attendance Secretary |
January 2004, May 2004 |
F |
Evaluation of grade books turned in by teachers. |
Benefits
from utilization of technology to make student record keeping and assessment
more efficient and supportive of teachers’ efforts to meet each student’s
academic needs.
1.
Teachers have access to
student information at their desktop.
This allows teachers to access phone numbers and other information. This makes it easier for teachers to
communicate with parents.
2.
Teachers have access to
student schedules so student-teacher conferences occur in a timely
manner.
3.
The computerized grade book
allows the teacher to spend less time on paperwork and spot learning problems
earlier than might occur without a computerized grade
book.
4.
The computerized grade book
allows the teacher to give immediate feedback to parents and students about
their grades.
3h. List of clear goals and a
specific implementation plan to utilize technology to make teachers and
administrators more accessible to parents.
Goal: All school administrators and teachers
will use technology to make information more accessible to
parents.
i. & j. Benchmarks:
3h.1 By September 2003, the school report
card, prepared by principal and other mailings to parents will be made using
computer software appropriate to the task.
3h.2 By
September 2002, all administrators and teachers will be accessible through
email.
3h.3 By
September 2003,
3i. Description of
the process that will be used to monitor whether the strategies and
methodologies utilizing technology are being implemented according to the
benchmarks and timeline.
Goal
# |
Implementation
Plan/Activities |
Responsible Dept. or
Position |
Timeline |
Budget Source |
Monitoring and Evaluation
activities |
|
3h.1 |
Send out school report card |
Principal |
November 2003 |
F |
|
|
3h.2 |
Update email accounts for admin and staff and publish
them to community |
Technology Coordinator |
September 2002 |
F |
|
|
3h.4 |
Setup district web site |
Technology Coordinator |
Start Nov 2002 ongoing |
F |
3j.4
Superintendent, Superintendent/principal,
Staff |
Benefits from
utilization of technology to make teachers and administrators more accessible to
parents.
1. Administrators and teachers will spend less time with written documents that have to go home through the use of technology.
2. Parents can communicate with administrators and teachers with email at any time of the day and not depend on face-to-face visits or rely on getting through on a telephone.
3. Parents and students will have timely access to school information by looking at the web site.
4. PROFESSIONAL DEVELOPMENT
COMPONENT
4a. Summary of the
teachers’ and administrators’ current technology skills and needs for
professional development.
Currently, all administrators & K-8 staff have participated in staff
development that includes computer use training in email, Aeries/ABI, CTAP
online & CTAP2. The K-12 staff
has participated in staff development activities using software that targets the
state standards. These software
packages include Scholastic Reading Inventory, Accelerated Reader, Star Reader,
and Accelerated Math.
Staff development needs include training in the use of word processing, databases, spreadsheets, and integration of technology into lesson plans that are aligned with BESD goals and state standards. This data is a result of the CTAP2 inventory. There is also an ongoing need to train new teachers that are hired each year and are not familiar with technology in the BESD.
4b. List of
clear goals and a specific implementation plan for providing professional
development opportunities based on the needs assessment and Curriculum Component
goals, benchmarks, and timeline.
4b.1 By June of 2005, professional
development opportunities will raise the Technology “Levels of Proficiency” in
100% staff as indicated by Individualized Technology Learning Plans (ITLP).
4b.2 By September of each year new teachers
will receive training in the use of technology available to them in the
BESD.
Staff buy-back days and
monthly minimum days will be used to develop individualized technology learning
plans and to conduct necessary training as
required by the curriculum component of this plan. Since the needs will vary from
year to year, the training focus and amount of time set aside for group or
individual training will vary.
The
superintendent/principal, the technology coordinator and the technology team
will evaluate the current staff training needs at the end of each school year
and develop an appropriate training and evaluation schedule for the upcoming
year. When necessary, roving subs
will be provided to cover a teacher’s class while he/she is receiving one-on-one
technology training.
The Brittan school district
has provided the entire staffs access to CTAP online
for technology training. We have
books and data files available to facilitate independent training in the use of
the Microsoft Office programs. The computer lab is available both before and
after school for independent training and Internet access to CTAP
online.
We are selecting peer mentors at the primary, intermediate and upper grade levels to aid in the use of technology, especially the integration of its use into daily classroom activities. A student technology aide program will be developed and implemented to assist both staff and other students in the use of technology.
4c. List of
benchmarks and a timeline for implementing planned strategies and
activities. (Teachers will be
encouraged to use CTAP Online, community college courses, and district
training's.)
The Individual Technology Learning Plan will be developed annually by
staff (certificated, classified and administrative) and will reflect the
goals
needed to improve their tech skills and their technology integration abilities.
Our administrators will develop goals relevant to the suggested skills
encompassed in the AB75 training.
These goals will make up the staff individualized technology learning
plan. Staff will be expected to set at least two goals: one goal for the
development of their technology proficiencies and another goal that relates to
the benchmarks set forth in the Curriculum component of the District Technology
plan. The Supt./Principal will include goals pertinent to administrative
technology as part of his annual goal setting with the
board.
4c.1 By June of 2004, 30% of staff will Institute Individualized Technology Learning Plan
(ITLP).
4c.2 By June of 2005, 60% of staff will Institute Individualized Technology Learning Plan (ITLP).
4c.3 By June of 2006, 100% of staff will Institute Individualized Technology Learning Plan
(ITLP).
4c.4 By September of each year new teachers will
receive training in the use of computers, email, telephones and voice
mail.
Staff will complete the
CTAP2 assessment each May. The staff individualized technology
learning plans (ITLP) will be developed based on the results of a district
technology questionnaire, CTAP2 and the curricular benchmarks
identified in this plan for the particular year. The Principal and
Technology Coordinator will review the needs identified in the ITLP and
correlated with CTAP2 and develop appropriate whole staff and individual
training opportunities for the upcoming school year.
As the individual’s needs are met, they
will be checked off and the next area of focus will be scheduled for
training. This will continue
throughout the school year.
The ITLP data will be
entered in a database and monitored by the Superintendent/Principal & the
Technology Coordinator. Benchmarks
will be set and agreed upon in June of each year. In February each year, all ITLPs will be
reviewed to determine what has been accomplished and what needs to be done to
assure that 100% of the staff reaches his/her benchmark by the end of the school
year.
4d. Description of the process that
will be used to monitor whether the professional development goals are being met
and whether the planned professional development activities are being
implemented in accordance with the benchmarks and
timeline.
Implementation
Plan/Activities |
Responsible Dept. or Position |
Timeline |
Budget Source |
Monitoring and Evaluation activities |
|
Technology assessment
(CTAP2) |
Superintendent/ principal |
Spring annually 2003-2006 |
CTAP |
Principal and Technology coordinator |
|
Staff develop ITLP |
Principal, staff |
June Annually 2003-2006 |
C, F |
Principal |
|
Provide staff development opportunities to meet ITLPs |
Principals, Technology Coordinator |
2003-2006 |
G, CTAP |
Review mentoring logs |
|
Provide site coach mentors to assist staff |
Principals, technology coordinator |
September annually 2003-2006 |
G, CTAP |
Quarterly review with site mentors reporting to principal |
|
Collect ITLPs |
Principals, technology coordinator |
June Annually 2003-2006 |
N/A |
Principal and tech coordinator review % of ITLP
Goals met, assess quality of evidence and present
findings to staff and
board. |
Benefits from
professional development based on staff needs
assessment:
1. New teachers receive training and support in the use of technology.
2.
Teachers plan
and execute ITLPs and they have mentors to provide support to help complete them
successfully.
3.
The BESD
raises the technology skill level of employees. This is one of the district goals and it
is line with state standards for teachers.
5. INFRASTRUCTURE, HARDWARE, TECHNICAL
SUPPORT, AND SOFTWARE COMPONENT
5.a. and
b. Existing
infrastructure, hardware, technical support and software. Infrastructure, hardware,
technical support and software needed to support the implementation of the
Curriculum and Professional Development Components.
The
plan must include an assessment of the telecommunication services, hardware,
software and other services that will be needed to improve education or library
services.
Each classroom
has at least one computer (most have two or more), and every classroom is
connected to the Internet; while these are inventoried and licensed, all are at
least three years old. There is at least one “drop” per classroom connecting
every classroom to the Internet and hubs support additional stations. The newer classrooms (12 of them) have
11 drops each for connectivity. The
library contains 5 student multi-media computers (over three years old)
connected to the Internet. A T-1
line connects the school/district to Internet services.
Each
3rd/8th classroom has a TV/VCR and a phone. Many have an Averkey hooked up to their
TV/VCR, which allows presentation of the teacher computer desktop over the
TV. This is a temporary solution
for demonstration and presentation in the classroom. Eventually the K-5th grade
classrooms will have a projector for each grade level and the
6th/8th grade classrooms will each have access to their
own projector. There is cable
access to most of the classrooms.
Goal: To provide students and
staff with access to current technology in labs, library and
classrooms.
Objective: To have a student to
computer ratio in classrooms of at least 5:1 and replace staff and library
computers by June of 2006.
Benchmarks:
District Assessment |
Has |
Needs | |||
|
Staff Computers/Printers |
33 (3 plus years old) |
4 (newer than 3 years) 37 printers |
33 new computers |
| |
|
Student Computer/Printers |
8 (new 2002 in lab). 24 (4 plus yrs old in lab) |
120 (4 plus years old) 2nd/8th Grades 22 Printers |
24 lab computers 140 classroom computers (5 each) 10 Printers | ||
|
Staff Loaner Laptop Computers. |
1 |
|
3 | ||
|
TV/VCR |
20 |
|
10 |
| |
|
DVD Player |
0 |
|
30 |
| |
|
Averkeys |
20 |
|
10 |
| |
|
Library Computers/Printers |
7Computer (new 2002) |
2 old printers |
1 LaserJet & 1 color printer |
| |
|
Scanners |
2 School wide |
|
13 total (1 for each grade K-5, 6th classes, 7/8 Core, Science, Music, Elective rooms.) | ||
|
Digital/Video Cameras |
2 Digital 0 Video |
|
13 total (1 for each grade K-5, 6th classes, 7/8 Core, Science, Music, Elective rooms.) | ||
|
Digital Projectors |
1 very old one |
|
17 total (1 for each grade K-5, 6th classes, 7/8 Core, Science, Math, P.E, Music, Elective rooms, Computer lab, & Library) | ||
|
AlphaSmart 2000 Units |
12 |
|
0 |
| |
|
AlphaSmart 3000 Units |
One cart (30 units) |
|
7 (carts of 30 units each) One cart per grade 3rd/4th, 1 cart per every 2 classrooms 5th/6th grade, 1 cart 7th, 1 cart 8th Current cart placed in library for units to be checked out by students. | ||
|
Student Hand held PDA’s |
0 |
|
Exploring options with CTAP. |
| |
|
Staff Hand held PDA’s |
2 |
|
Exploring options with CTAP. |
| |
|
Management Software |
Aeries (attendance, student data, grade book etc). |
|
A program that enables the instructor to manage/view all student desktops from one computer. |
| |
|
Testing Software |
SRI, Star Reader, Accelerated Reader |
|
Accelerated Math Standardized keyboarding assessment software. |
| |
|
District
Assessment |
Has |
Needs |
| ||
|
General Software |
Microsoft Windows 98/Office 97 |
|
Microsoft Windows XP/Office XP upgrade on all computers school wide. |
| |
|
Grade level Curriculum based software |
|
|
Language Arts, Math & Science remediation and enrichment software. |
| |
|
Infrastructure |
T-1 with CAT5 connectivity to data in all classrooms. Telephones in all classrooms. |
Upgrade infrastructure & servers. |
| ||
|
Tech Support |
Technology Coordinator |
Computer Lab Aide |
Technology Trainer/ Lab Coordinator Technology Mentor at each grade level. Student Technology Classroom Aides (GATE program) |
| |
5c. List of
clear benchmarks and a timeline for obtaining the hardware, infrastructure,
learning resources and technical support required supporting the other
components of the plan.
Goals:
5c.1 By August 2003, 20% of the teaching staff will have new, Pentium 4 or better, desktop computer systems with the most current management and production software available.
5c.2 By August 2004, 60% of the teaching staff will have new, Pentium 4, Windows XP multimedia systems. They will be loaded with Microsoft Office XP and the most current management and production software available.
5c.3 By August 2005, 100% of the teaching staff will have new, Pentium 4, Windows XP multimedia systems.
They will be loaded with Microsoft Office XP and the most current management and production software available.
5c.4 By August 2005, a program will be developed to distribute or loan replaced computers/printers to Staff and Students in need of home computer systems.
5c.5 By August 2006, 100% of the working replaced school computers will be refurbished and made available to Brittan staff and students without home computers.
5c.6 By August 2003, we will replace 24 lab computers and 24 student classroom computers (grades 4-8) with new Pentium 4, Windows XP multimedia systems. They will be loaded with Microsoft Office XP and our currently available curriculum and testing software.
5c.7 Between August 2004-2006, we will have purchased approximately 40 new student computers annually to reach our goal of 5 student computers per K-8 classroom. Each will be loaded with the most current available grade level, curriculum software.
5c.8 By August 2007, we will purchase and place into the appropriate classrooms, 10 new printers, 10 TV/VCR units, 30 classroom DVD players, 10 new AverKeys, 13 Scanners, 13 Digital/Video cameras, & 17 Digital Projectors.
5c.9 By August 2004, our Library will purchase 1 new LaserJet printer and 1 new color printer.
5c.10 By August 2006, we will have 7 additional AlphaSmart carts (30 units each) to be placed in grades 3-8.
5c.11 By August 2004, we will have a management software program for our computer lab, which allows the instructor to manage/view all student desktops from one computer.
5c.12 By August 2003, we will purchase and install Accelerated Math and a standardized Keyboarding assessment program onto the appropriate lab and classroom computers.
5c.13 By August 2006, computers school wide will be operating with Microsoft Windows XP/Office XP.
5c.14 By August 2003, research into available Language Arts, Math & Science remediation and enrichment software will be complete. By August 2004, Language arts remediation and enrichment software will be purchased and loaded onto computers. By August 2005, Math remediation and enrichment software will be purchased and loaded onto computers.
By August 2006, Science remediation and enrichment software will be purchased and loaded onto computers.
5c.15 By August 2006, We will upgrade our infrastructure, hardware, servers and software.
5c.16 By August 2003, we will create and fund a position responsible for directing the computer lab, handling on site software training issues, management of language arts and math testing databases, administration of student reading/math computer tests and creating testing reports. {Technology Trainer/Lab Director}
5c.17 By October 2003, we will have selected a technology mentor at each grade level. By August 2003, we will have investigated options for the implementation of a student technology classroom aide program.
Goal
# |
Implementation
Plan/Activities |
Responsible Dept. or
Position |
Timeline |
Budget Source |
Monitoring/Evaluation activities
5d |
5c.1 |
20 % Teaching Staff new
computers |
Tech
Coordinator Superintendent/Principal
|
August
2003 |
C, F,
G |
Purchase
Orders |
5c.2 |
60 % Teaching Staff new
computers |
Tech
Coordinator Superintendent/Principal
|
August
2004 |
C, F,
G |
Purchase
Orders |
5c.3 |
100% Teaching Staff new
computers |
Tech
Coordinator Superintendent/Principal
|
August
2005 |
C, F,
G |
Purchase
Orders |
5c.4 |
Development of a loan or
distribution program for old computers/printers. |
Technology
Committee
|
August
2005 |
N/A |
Written
Plan |
5c. 5 |
Loan/distribution program in
operation. |
Tech
Coordinator Superintendent/Principal
|
August
2006 |
N/A |
Loan
records or receipts |
5c.6 |
Purchase 24 lab computers/24
student classroom computers. |
Tech
Coordinator Superintendent/Principal
|
August
2003 |
C, F,
G |
Purchase
Orders |
5c.7 |
Purchase 40 student computers
annually. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2004 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase a total of 13 Scanners to be placed in
the Lab and classrooms. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase a total of 10 printers to be placed in
appropriate classrooms. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase a total of 10 TV/VCR units to be placed
in appropriate classrooms. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase a total of 30 classroom DVD Players. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase up to 10 new
AverKeys. |
Tech
Coordinator Superintendent/Principal
|
August
2004 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase a total of 13 Digital/Video cameras for
classroom use. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.8 |
Purchase 17 Digital Projectors to be used in
selected classrooms. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2007 |
C, F,
G |
Purchase
Orders |
5c.9 |
Library will purchase 2 new
printers. |
Tech
Coordinator Superintendent/Principal
|
August
2004 |
C, F,
G |
Purchase
Orders |
5c.10 |
Purchase 7 new AlphaSmart carts.
|
Tech
Coordinator Superintendent/Principal
|
August
2006 |
C, F,
G |
Purchase
Orders |
5c.11 |
Purchase management software program for the
computer lab. |
Tech
Coordinator Superintendent/Principal
|
August
2004 |
C, F,
G |
Purchase
Orders |
5c.12 |
Purchase and install Accelerated Math and a
standardized Keyboarding assessment program onto the appropriate lab and
classroom computers. |
Tech
Coordinator Superintendent/Principal
|
August
2003 |
C, F,
G |
Purchase
Orders |
5c.13 |
Install Microsoft Windows XP/Office XP on all of
the district computers. |
Tech
Coordinator Superintendent/Principal
|
August
2003-2006 |
F |
Purchase
Orders |
5c14 |
Research into available Language
Arts, Math & Science remediation and enrichment software
programs. |
Technology
Committee Technology
Mentors Lab
Director |
August
2003 |
N/A |
Purchase
Orders |
5c.14 |
Purchase Language arts remediation and enrichment
software & load onto computers. |
Tech
Coordinator Superintendent/Principal
|
August
2004 |
C, F,
G |
Purchase
Orders |
5c.14 |
Purchase Math remediation and enrichment software
& load onto computers. |
Tech
Coordinator Superintendent/Principal
|
August
2005 |
C, F,
G |
Purchase
Orders |
5c.14 |
Purchase Science remediation and enrichment
software & load onto computers. |
Tech
Coordinator Superintendent/Principal
|
August
2006 |
C, F,
G |
Purchase
Orders |
5c.15 |
Purchase and install a fiber optic backbone to all
buildings. Purchase
additional switches and hubs.
Upgrade servers. |
Tech
Coordinator Superintendent/Principal
|
August
2006 |
C, F,
G |
Purchase
Orders |
5c.16 |
Create and fund a new technology
position. |
Superintendent/Principal District
Board |
August
2003 |
F,
G |
Written
job description Board
adoption |
5c.17 |
Select a technology mentor at each grade
level. |
Technology
Committee Superintendent/Principal |
October
2003 |
G |
Select
mentor and set stipend amount |
5c.17 |
Investigate options for the implementation of a
student technology classroom aide program. |
Technology
Committee Superintendent/Principal |
August
2003 |
G |
Possible
Gate program/Elective
Class |
6 FUNDING/BUDGET
COMPONENTS
6.a. List of established and
potential funding sources and cost savings, present and future.
Describe resources that are
available or could be obtained to implement the plan.
v
A percentage of the general
fund.
v
Site Improvement
Funds
v
Brittan Activity Club
(parents club)
v
Lottery
Fund
v
Categorical funding,
including Title I
Proposed Sources
v
School Renovation Technology
Grant
v
Enhancing Education Through
Technology Grant
v
Community fund
raising
6.b. Estimate implementation
costs for the term of the plan (3-5 years).
|
|
2003&2004 |
2005 |
2006 |
Total |
|
Staff Development |
10,500 |
21,000 |
21,000 |
52,500 |
|
Hardware |
100,000 |
100,00 |
100,000 |
300,000 |
|
Software |
10,000 |
10,000 |
10,000 |
30,000 |
|
Infrastructure |
4,000 |
10,000 |
10,000 |
24,000 |
|
Tech support |
73,000 |
73,000 |
73,000 |
219,000 |
|
Annual Total |
197,500 |
214,000 |
214,000 |
625,500 |
|
|
|
|
|
|
Category |
Description |
Y1 |
Y2 |
Y3 |
|
1000 |
3 Teacher
Tech |
1500 |
1500 |
1500 |
|
2000 |
Tech
Support, staff development |
59,000 |
59,000 |
59,000 |
|
3000 |
|
14,000 |
14,000 |
14,000 |
|
4000 |
Hardware,
Software, Infrastructure |
114,000 |
120,000 |
120,000 |
|
5000 |
Staff
Development |
9,000 |
19,500 |
19,500 |
|
6000 |
|
|
|
|
Budget
Analysis:
6.c. Description of the level of
ongoing technical support the district will provide.
The
6.d. District’s replacement
policy for obsolete equipment:
The Technology Coordinator will be responsible for determining when tech
equipment has become obsolete
As funding becomes
available, obsolete equipment will be replaced and bumped down in an 8th grade
down to Kindergarten hierarchy.
6.e. Description of the feedback loop used to monitor progress and update funding and budget decisions.
The Tech Coordinator, Tech
Trainer, & Superintendent/Principal will meet quarterly to review
progress. A progress report and
funding/budget review will then be considered and presented to the following
groups when appropriate (based on funding needs and probability of need being
met by each group):
·
Site
Counsel
·
Technology
Committee
·
Brittan Activity
Club
·
7a. Description of how technology’s
impact on student learning and attainment of the district’s curricular goals, as
well as classroom and school management, will be
evaluated.
7a.1 By 2004, 70% of
students will increase their STAR score in each core subject area by 5 NPR over
the previous year.
7a.2 By 2005, 80% of
students will increase the STAR score in each core subject area by 5 NPR over
the previous year.
7a.3 By 2006, 90% of
students will increase the STAR score in each core subject area by 5 NPR over
the previous year.
The BESD secretary will compose lists of students who reach the goals listed above on an annual basis and communicate them to the site principals.
7a.4 Teachers will take CTAP2 inventory skills survey annually. This will inform superintendent and principals effectiveness of staff development.
7a.5 The Technology Trainer and Superintendent/Principal will monitor classroom management and use of technology in the classroom. The Principal will take classroom management into individual teacher evaluation. This evaluation is communicated to individual teachers.
7a.6 The Technology Coordinator, Technology Trainer or Superintendent/Principal will make quarterly reports to the site council, District Board and/or Technology Committee, as to the progress of the District Technology Plan.
7a.7 The Superintendent will make semiannual reports to the school board regarding the progress and status of the Technology Plan.
7b. Schedule for evaluating the
effect of plan implementation.
|
Implementation
Activity |
Timeline |
Responsible
person(s) |
|
Teachers take CTAP2 |
Fall of 2002 -2006 |
Staff and principal |
|
Principals observe teachers in classroom and how
they use technology |
Once in fall and once in spring of each
year |
Principal |
|
Technology Trainer observes teachers use of
technology in classroom and provides support and
training. |
Done informally and on a daily
basis |
Technology Trainer |
|
Administer STAR test |
Spring of each year |
Principal and
staff |
7c. Description of how the
information obtained through the monitoring and evaluation will be
used.
7c.1 CTAP2 survey will help the administration plan the staff development needed for technology.
7c.2 Principal and Technology Trainer classroom observations will guide staff development.
7c.3 The superintendent and principals will use the results of the STAR tests to target underachieving students and proscribe intervention techniques to help these students achieve district goals.
7c.4
The school API
scores will be communicated to staff, students, site councils, school board, and
community. The score will be used
as a benchmark to monitor the effectiveness of the technology plan.
8. EFFECTIVE COLLABORATIVE STRATEGIES WITH ADULT
LITERACY PROVIDERS
COMPONENT
Adult Literacy:
Needs: According to Spring 2002 STAR data, 5% of the parents of students served
by
9. EFFECTIVE RESEARCH BASED METHODS AND
STRATEGIES COMPONENT
9a. Describe how the education
technology strategies and proven methods for student learning, teaching and
technology management are based on relevant research and effective
practices.
9b. Provide a description and
reference the research literature that supports why or how the model improves
student achievement.
The educational technology, curriculum and staff
development departments in the district have an ongoing process of grounding
practices in research proved methodologies. Currently, the district is implementing
reading and math programs chosen for their evidence based results with student
achievement.
(9.a. & b.)
|
Component
Strategies |
Relevant Research
Citation |
Description of
Research (annotation) |
Process Of
Examination Of Research |
|
Student
Learning Mathematics |
Koedinger, K.,
Anderson, L.k Hadley, W., & Mark, M., (1997). Intelligent Tutoring
Goes School in the Big
City.
University. |
Mathematics
courses…can result in improved mathematics skills as measured by
standardized assessments. These types of courses also result in improved
problem-solving skills and ability to translate between equivalent representations of algebraic content. |
As part of the adoption process the research supporting the development and piloting of the curriculum was reviewed. |
|
Student
Learning |
Butzin, S. M. (2000, June). Project Child: A decade of success for young children [Feature]. Technology Horizons in Education Journal, 27(11). Retrieved from http://thejournal.com/magazine/valult/A2882.cfm (Coley, 1997). Sivin-Kachala, J., & Bialo, E.
(2000). 2000 research report on the effeciveness of technology in schools
(7th ed.). |
The computer-integrated instructional program (Project Child) found that the elementary students in project classrooms from kindergarten through fifth grade consistently had higher test scores and better discipline than their counterparts. “…many conclude that the computer assisted instruction and drill and practice software can significantly improve students’ scores on standardized achievement tests in all major subject areas, preschool through higher education.” |
As part of the adoption process the research supporting the development and piloting of the curriculum was reviewed. |
|
Teaching |
Sivin-Kachala, J., & Bialo, E. (2000). 2000 research report on the
effectiveness of technology in schools (7th ed.).
|
“…results of over 300 studies of use, authors concluded that teacher training was the most significant factor influencing the effective use of educational technology to improve student achievement. Specifically, the report states that students of teachers with more than ten hours of training significantly outperformed students of teachers with five or fewer training hours.” |
The research regarding staff development in technology use and student achievement was reviewed. |
|
Technology
Management |
Strudler, N. (1994). The role of school based
technology coordinators as change agents in elementary school
programs: A follow-up
study. Presented at AERA,
|
There is a continuing need for the school site presence of a technology coordinator who can serve as a mentor or “translator” of technology applications and instructional integration for teachers. Appropriate technology resource personnel are not only for the early stages of a technology initiative or technology plan. |
The research regarding effective technology use in school systems was reviewed. |
9.c. Provide a description of the process for development and utilization of innovative strategies for the delivery of specialized or rigorous academic courses through the use of technology, including distance-learning technologies.
As a small, rural K-8
district, staff and administration will annually review our curriculum in
relation to identified student needs for additional rigorous academic curricula
and/or distance learning needs. Taking into account the total needs of students,
including social interaction and mentoring, staff and administration will
research the most effective learning models and strategies. These will include site based enrichment
software, individualized coursework, (acceptable for either high school or
college credit), and distance learning opportunities at the high school,
community college and through the University of California and private
institutions such as Stanford.
Goal: Increase ability to offer
specialized or rigorous academic courses through the use of technology,
including distance learning.
Objective: By June 2006, access to specialized or rigorous academic courses through the use of
technology, including distance learning will be available to all identified
students in the district.
By
June of 2003,
specialized and rigorous academic courses utilizing technology, including
distance learning, will be expanded to include all 6-8
students.
By
June of
2005, access to specialized
or rigorous academic courses through the use of technology, including distance
learning will be available to all identified students in the
district.
d. Implementation Plan/Activities
|
Responsible Dept. /
Position |
Timeline |
Budget Source* |
Monitoring
And Evaluation Activities |
|
Identify current offerings
and review student needs for additional courses |
Curriculum/Tech
committees |
August
2003 |
D |
Annually review learning opportunities for student
use, success and appropriateness in light of student data and demographics
at site and district levels. Changes to the course offerings will be reviewed by
site and district staff with recommendations to the Tech Committee for
suggested changes and these will be forwarded to the Superintendent and
appropriate committees for approval. The Superintendent and appropriate committees will
appoint appropriate personnel to implement recommended
changes. |
|
Collaborate with appropriate
institutions to develop/expand/narrow current
offerings. |
Curriculum/Tech
committees |
August
2003 |
D | |
|
Coordinate with
Instructional and Information Technology depts. To assure that appropriate
infrastructure and hardware are available. |
Tech
Coordinator Superintendent/ Principal |
August
2003 |
D | |
|
Develop appropriate
offerings for 6-8 |
Curriculum/Tech
committees |
Aug.
03- Jan
04 |
D | |
|
Develop appropriate
offerings for k_6 |
Curriculum/Tech
committees |
August
2005 |
D | |
|
Research
Support |
Citation |
Annotation | ||
|
Silverstein, G., Frechtling, J., & Miyoaka, A.
(2000). |
Evaluation
of the use of technology Board of Education).
|
“Gifted students can work at their
own pace and explore subjects in more depth than the basic
curriculum. Technology can also analyze and provide immediate feedback on
performance, suggest modifications in instruction where necessary to
improve student achievement.” | ||
Enhancing Education Through Technology Formula Grant Program
Criteria for EETT-Funded Education Technology Plans
In
order to be approved, an EETT-funded plan needs to have “Adequately Addressed”
each of the following.
|
1.
PLAN
DURATION |
|
Adequately Addressed |
Not Adequately Addressed
|
|
a.
The
plan should guide the district’s use of education technology for the next
3-5 years. |
1 |
The benchmarks and
timelines in the plan outline activities and strategies for the next 3-5
years. |
The benchmarks are not
associated with any particular timeline or the timeline is less than 3
years or more than 5 years in length. |
|
2.
STAKEHOLDERS Corresponding EETT Requirement(s):
7, 11, |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
Description
of how a variety of stakeholders from within the school district and the
community-at-large participated in the planning process.
|
2 |
The planning team
consisted of representatives who will implement the plan, including
district curriculum and information technology staff, site administrators,
teachers, students, parents, community non-profits and businesses. If a variety of stakeholders did
not assist with the development of the plan, a description of why they
were not involved is included. |
Little evidence is
included that shows that the district actively sought participation from a
variety of stakeholders. |
Enhancing Education through
Technology Formula Grant Program
Criteria for EETT Funded Education Technology Plans
|
3.
CURRICULUM
COMPONENT Corresponding EETT Requirement(s):
1, 2, 3, 8, 10, & 12. |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
Description of
teachers’ and students’ current access to technology tools both during the
school day and outside of school
hours. |
6 |
The plan describes the technology access available in the classrooms, library/media centers, or labs for all students, including special education, GATE, English Language Learners, etc., both during and after school hours. |
The plan explains technology access in terms of a student-to-computer ratio, but does not explain if computers are in the classrooms, library/media centers, or labs, who has access, and when various students and teachers can use the technology. |
|
b.
Description of the
district’s current use of hardware and software to support teaching and
learning. |
7 |
The plan describes the
typical frequency and type of use (technology skills/information
literacy/integrated into the curriculum) generally by type of school
and/or academic subject. |
The plan recites
district policy regarding use of technology, but provides no information
about its actual use. |
|
c.
Summary of the
district’s curricular goals and academic content standards in various
district and site comprehensive planning
documents. |
7,
8 |
The plan references
other district documents that guide the curriculum and/or establish goals
and standards. |
The plan does not
reference district curriculum
goals. |
|
d.
List of clear goals
and a specific implementation plan for using technology to improve
teaching and learning by supporting the district curricular goals and
academic content
standards. |
9, 10
|
The plan clearly
identifies grade levels, subjects, or student populations that will be the
focus for the term of the plan.
The plan delineates clear, specific and realistic goals for using
technology to support the district’s curriculum goals and academic content
standards to improve learning. The implementation plan clearly supports
accomplishing the goals. |
The plan suggests how
technology will be used, but is not specific enough to know what action
needs to be taken to accomplish the
goals. |
|
e.
List of clear goals
and a specific implementation plan as to how and when students will
acquire technology and information literacy skills needed to succeed in
the classroom and the
workplace. |
10-12 |
For the focus areas,
the plan delineates clear, specific and realistic goals for using
technology to help students acquire technology and information literacy
skills. The implementation plan clearly supports accomplishing the
goals. |
The plan suggests how
technology will be used, but is not specific enough to determine what
action needs to be taken to accomplish the
goals. |
Enhancing Education Through Technology Formula Grant Program
Criteria for EETT District Education Technology Plans
|
3. CURRICULUM COMPONENT,
Continued |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
f.
List of clear goals
and a specific implementation plan for programs and methods of utilizing
technology that ensure appropriate access to all
students. |
12-14 |
For the focus areas,
the plan delineates clear, specific and realistic goals for using
technology to support the progress of all students, including special
education, GATE, English Language Learners, etc. The implementation plan
clearly supports accomplishing the
goals. |
The plan suggests how
technology will be used, but is not specific enough to know what action
needs to be taken to accomplish the
goals. |
|
g.
List of clear goals
and a specific implementation plan to utilize technology to make student
record keeping and assessment more efficient and supportive of teachers’
efforts to meet individual student academic
needs. |
14,
15 |
The plan delineates
clear, specific and realistic goals for using technology to support the
district’s student record-keeping and assessment efforts. The
implementation plan clearly supports accomplishing the
goals. |
The plan suggests how
technology will be used, but is not specific enough to know what action
needs to be taken to accomplish the
goals. |
|
h.
List of clear goals
and a specific implementation plan to utilize technology to make teachers
and administrators more accessible to
parents. |
15 |
The plan delineates
clear, specific and realistic goals for using technology to facilitate
improved two-way communication between home and school. The implementation
plan clearly supports accomplishing the
goals. |
The plan suggests how
technology will be used, but is not specific enough to know what action
needs to be taken to accomplish the
goals. |
|
i.
List of benchmarks and
a timeline for implementing planned strategies and
activities. |
16 |
The benchmarks and
timeline are specific and realistic.
Teachers, administrators and students implementing the plan can
easily discern what steps will be taken, by whom, and
when. |
The benchmarks and
timeline are either absent or so vague that it would be difficult to
determine what should occur at any particular
time. |
|
j.
Description of the
process that will be used to monitor whether the strategies and
methodologies utilizing technology are being implemented according to the
benchmarks and timeline. |
16 |
The monitoring process
is described in sufficient detail so that who is responsible, and what is
expected is clear. |
The monitoring process
is either absent, or lacks detail regarding who is responsible and what is
expected. |
Enhancing Education Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
4.
PROFESSIONAL DEVELOPMENT
COMPONENT Corresponding EETT Requirement(s):
5 & 12. |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
Summary of the
teachers’ and administrators’ current technology skills and needs for
professional development. |
17 |
The plan provides a
clear summary of the teachers’ and administrators’ current technology
skills and needs for professional development. The findings are summarized in the
plan by discrete skills in order to facilitate providing professional
development that meets the identified needs and plan
goals. |
Description of current
level of staff expertise is too general or relates only to a limited
segment of the district’s teachers and administrators in the focus areas
or does not relate to the focus areas, i.e. only the fourth grade teachers
when grades 4-8 are the focus grade
levels. |
|
b.
List of clear goals
and a specific implementation plan for providing professional development
opportunities based on the needs assessment and the Curriculum Component
goals, benchmarks, and
timeline. |
17 |
The plan delineates
clear, specific and realistic goals for providing teachers and
administrators with sustained, ongoing professional development necessary
to implement the Curriculum Component of the plan. The implementation plan
will clearly supports accomplishing the
goals. |
The plan speaks only
generally of professional development and is not specific enough to ensure
that teachers and administrators will have the necessary training to
implement the Curriculum
Component. |
|
c.
List of benchmarks and
a timeline for implementing planned strategies and
activities. |
|
The benchmarks and
timeline are specific and realistic.
Teachers and administrators implementing the plan can easily
discern what steps will be taken, by whom, and when. |
The benchmarks and
timeline are either absent or so vague that it would be difficult to
determine what steps will be taken, by whom, and when. |
|
d.
Description of the
process that will be used to monitor whether the professional development
goals are being met and whether the planned professional development
activities are being implemented in accordance with the benchmarks and
timeline. |
|
The monitoring process
is described in sufficient detail so that who is responsible and what is
expected is clear. |
The monitoring process
is either absent, or lacks detail regarding who is responsible and what is
expected. |
Enhancing Education Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
5.
INFRASTRUCTURE,
HARDWARE, TECHNICAL SUPPORT, AND SOFTWARE
COMPONENT Corresponding EETT Requirement(s):
6, & 12. |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
Describe the
technology hardware, electronic learning resources, networking and
telecommunication infrastructure, physical plant modifications, and
technical support needed by the district’s teachers, students, and
administrators to support the activities in the Curriculum and
Professional Development Components of the
plan. |
20-22 |
The plan clearly
summarizes the technology hardware, electronic learning resources,
networking and telecommunication infrastructure, physical plant
modifications, and technical support proposed to support the
implementation of the district’s Curriculum and Professional Development
Components. The plan also
includes the list of items to be acquired, which may be included as an
appendix. |
The plan includes a
description or list of hardware, infrastructure and other technology
necessary to implement the plan, but there doesn’t seem to be any real
relationship between the activities in the Curriculum and Professional
Development Components and the listed equipment. Future technical support needs
have not been addressed or do not relate to the needs of the Curriculum
and Professional Development
Components. |
|
b.
Describe the
existing hardware, Internet access, electronic learning resources, and
technical support already in the district that could be used to support
the Curriculum and Professional Development Components of the
plan. |
20-22 |
The
plan clearly summarizes the existing technology hardware, electronic
learning resources, networking and telecommunication infrastructure, and
technical support to support the implementation of the Curriculum and
Professional Development Components.
The current level of technical support is clearly
explained. |
The inventory of
equipment is not by site or is so general that it is difficult to
determine what must be acquired to implement the Curriculum and
Professional Development Components. The summary of current technical
support is missing or lacks sufficient
detail. |
|
c.
List of clear
benchmarks and a timeline for obtaining the hardware, infrastructure,
learning resources and technical support required to support the other
plan components. |
22-25 |
The benchmarks and
timeline are specific and realistic.
Teachers and administrators implementing the plan can easily
discern what needs to be acquired or repurposed, by whom, and
when. |
The benchmarks and
timeline are either absent or so vague that it would be difficult to
determine what needs to be acquired or repurposed, by whom, and
when. |
|
d.
Description of the
process that will be used to monitor whether the goals and benchmarks are
being reached within the specified time
frame. |
24,
25 |
The monitoring
process is described in sufficient detail so that who is responsible and
what is expected is clear. |
The monitoring
process is either absent, or lacks detail regarding who is responsible and
what is expected. |
Enhancing Education Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
6.
FUNDING AND BUDGET
COMPONENT Corresponding EETT Requirement(s):
7, & 13. |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
List of established
and potential funding sources and cost savings, present and
future. |
26 |
The plan clearly
describes resources* that are available or could be obtained to implement
the plan. The process for
identifying future funding sources is
described. |
Resources to implement
the plan are not identified or are so general as to be
useless. |
|
b.
Estimate
implementation costs for the term of the plan (3-5
years). |
26,
27 |
Cost estimates are
reasonable and address the total cost of
ownership. |
Cost estimates are
unrealistic, lacking, or are not sufficiently detailed to determine if the
total cost of ownership is
addressed. |
|
c.
Description of the
level of ongoing technical support the district will
provide. |
27 |
The plan describes the
level of technical support that will be provided for implementation given
current resources and describes goals for additional technical support
should new resources become available. The level of technical support is
based on some logical unit of measure, such as number of
computers. |
The description of the
ongoing level of technical support is either vague or not included; is so
inadequate that successful implementation of the plan is unlikely, or is
so unrealistic as to raise questions of the viability of sustaining that
level of support. |
|
d.
Description of the
district’s replacement policy for obsolete
equipment. |
27 |
Plan recognizes that
equipment will need to be replaced and outlines a realistic replacement
plan that will support the Curriculum and Professional Development
Components |
Replacement policy is
either missing or vague. It
is not clear that the replacement policy could be
implemented. |
|
e.
Description of the
feedback loop used to monitor progress and update funding and budget
decisions. |
27 |
The monitoring process
is described in sufficient detail so that who is responsible, and what is
expected is clear. |
The monitoring process
is either absent, or lacks detail regarding who is responsible and what is
expected. |
* In this document, the term “resources” means funding, in-kind services, donations, or other items of value.
Enhancing Education
Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
7.
MONITORING AND EVALUATION
COMPONENT Corresponding EETT Requirement(s):
11 |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
Description of how
technology’s impact on student learning and attainment of the district’s
curricular goals, as well as classroom and school management, will be
evaluated. |
28 |
The plan describes the
process for evaluation utilizing the goals and benchmarks of each
component as the indicators of success.
|
No provision for an
evaluation is included in the plan. How success is determined is not
defined. The evaluation is
defined, but the process to conduct the evaluation is
missing. |
|
b.
Schedule for
evaluating the effect of plan
implementation. |
28 |
Evaluation timeline is
realistic. |
The evaluation
timeline is not included or indicates an expectation of unrealistic
results that does not support the continued implementation of the
plan. |
|
c.
Description of how the
information obtained through the monitoring and evaluation will be
used. |
29 |
The plan describes a
process to report the monitoring and evaluation results to persons
responsible for implementing and modifying the plan, as well as the plan
stakeholders. |
The plan does not
provide a process for using the monitoring and evaluation results to
improve the plan and/or disseminate the
findings. |
Enhancing Education Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
8.
EFFECTIVE COLLABORATIVE STRATEGIES
WITH ADULT LITERACY PROVIDERS TO MAXIMIZE THE USE OF
TECHNOLOGY Corresponding EETT Requirement(s):
11 |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
a.
If the district has
identified adult literacy providers, there is a description of how the
program will be developed in collaboration with those
providers. |
30 |
The plan explains how
the program will be developed in collaboration with adult literacy
providers. Planning included
or will include consideration of collaborative strategies and other
funding resources to maximize the use of technology.
|
There is no evidence
that the plan has been, or will be developed in collaboration with adult
literacy service providers, to maximize the use of technology.
|
Enhancing Education Through Technology Formula Grant
Program
Criteria for EETT Funded Education Technology Plans
|
9.
EFFECTIVE, RESEARCHED-BASED METHODS
AND STRATEGIES: Corresponding EETT Requirement(s):
4 & 9 |
Page in District
Plan |
Adequately Addressed
|
Not Adequately Addressed
|
|
b.
Description of how
education technology strategies and proven methods for student learning,
teaching, and technology management are based on relevant research and
effective practices. |
31,
32 |
The plan describes the
relevant research behind the plan’s design for strategies and/or methods
selected.
|
The description of the
research behind the plan’s design for strategies and/or methods selected
is unclear, unreliable, or
missing. |
|
c.
Description of
thorough and thoughtful examination of externally or locally developed
education technology models and
strategies. |
32,
33 |
The plan describes
references to research literature that supports why or how the model
improves student achievement. |
No research is
cited. |
|
d.
Description of
development and utilization of innovative strategies for using technology
to deliver rigorous academic courses and curricula, including distance
learning technologies (particularly in areas that would not otherwise have
access to such courses or curricula due to geographical distances or
insufficient resources). |
33 |
The plan describes the
process for development and utilization of strategies to use technology to
deliver specialized or rigorous academic courses and curricula, including
distance learning. |
There is no plan to
utilize technology to extend or supplement the district’s curriculum
offerings |